Solar PV inspection

Solar PV inspection with
IT-grade data delivery.

Thermal & visual surveys for utility and rooftop solar PV portfolios. Anomalies returned as GeoJSON, severity-ranked CSV, and an annotated PDF — not a video file.

▸ HOVER · DJI MAVIC 3 THERMAL · IR 640×512 · GSD 8 cm/px ◉ REC · NADIR-026 · 09:42:11 · 38°C · WHITEHOT
CAA UAS operatorSVN-RP-5e7paass28ru
Liability + hull€ 1,000,000 · Generali EU
EquipmentMavic 3 Thermal · EU C1
Languages · RegionEN · IT · SL
Engagements

Two engagement modes, one deliverable spec.

One-shot audits and fleet retainers share the same output discipline: structured data, severity-ranked, fit for direct ingestion into your O&M software.

Aerial thermal view of a utility-scale solar farm
SERVICE / 01

Utility solar thermal audit

A single site, single visit. Aerial thermography of ground-mount and rooftop arrays — string-level anomaly detection, per-module severity ranking, GeoJSON anomaly map and a signed PDF report.

Read more →
Aerial thermal sweep across a solar PV fleet
SERVICE / 02

Solar fleet retainer

Annual and post-event screening across a portfolio under one framework. One baseline flight per site, post-fault triggers included, year-over-year severity tracking. Priced per MW.

Read more →
Deliverables

What lands in your inbox.

Every output is named, formatted and time-bound. No "we'll send the report when it's ready" — every deliverable has a turnaround in working days.

DeliverableFormatStandard referenceTurnaround
Anomaly map
Per-string thermal anomalies, georeferenced
GeoJSON · KMLIEC TS 62446-35 working days
Severity-ranked table
ΔT, panel ID, module row, action class
CSV · XLSXIEC 61724-15 working days
Inspection report
Methodology, equipment, weather log, signed cover
PDF · A4IEC TS 62446-3 §87 working days
Orthomosaic
RGB + thermal, GeoTIFF, EPSG:3794
GeoTIFFOptional+3 working days
Raw imagery archive
R-JPEG, EXIF preserved, 7-day cloud link
R-JPEG · ZIP2 working days
Download sample report (PDF · 8.5 MB)
Honest scope

What we can do today, plainly.

We are a one-operator firm. Day-1 capability is Open Category A3 — sites without uninvolved people in the flight area. Specific Category and BVLOS scopes are available on declaration, with planning lead times stated up front.

  • Day-1
    Open Cat A3 · today
    Single operator, single aircraft. C1-class equipment. Ground-mount and rural utility PV, fenced sites.
  • On request
    Specific Cat · on declaration
    STS-01 or PDRA-S01 declaration, 2–3 week planning. Rooftop arrays adjacent to public space, larger MTOW.
  • On request
    BVLOS · partner-supported
    Large-fleet and corridor campaigns delivered with a partnered observer team. Quoted per site.
  • Not offered
    Night / over-people · scope-out
    Not offered. Will refer to a vetted operator rather than over-promise.
Pilot project

First inspection at-cost, before you commit a portfolio.

A single site, scoped end-to-end, delivered with the full data package. You evaluate the deliverables against your O&M workflow before any framework agreement is discussed.

Request pilot scoping → Typical response · ≤ 1 working day